Modified bitumen emulsion production unit UVB-2 (laboratory)
UVB-2 bitumen unit is designed for production of modified bitumen by injection of polymer.
Modified bitumen is used in construction and repairs of roads, bridges and overpasses as per effective regulations.
The unit can be used by facilities repairing or producing soft asphalt top, building waterproof finish and soft roofing.
The unit may be operated both indoors with adequate ventilation and outdoors.
The allowable ambient temperature for operation is +5°С to +40°С.
SPECIFICATIONS
of laboratory bitumen equipment.
# |
Parameter |
Value |
---|---|---|
1 |
The volume of the master boot capacity, l |
17 |
2 |
Amount of spare capacity loading, l |
17 |
3 |
The minimum load capacity of bitumenthe container l |
8 |
4 |
Maximum working load capacity bitumen, l |
10 |
5 |
Method of preparationmodified bitumen |
dispersing Bitumen and polymer(using a mill) |
6 |
Limiting temperature cookingmodified bitumen, C |
190 |
7 |
The minimum temperature of loaded bitumen C |
150 |
8 |
Heated working fluid containersusing the heater power, kW |
1,5 |
9 |
Control |
manual |
10 |
Control of the system units |
automatic |
11 |
Heaters power lines (not more), kW |
1 |
12 |
Maximum power consumption of the installation (no more), kW |
7,5 |
13 |
Diameter inlet adding liquid components mm |
10 |
14 |
Overall dimensions, mm, length width height |
1480 680 1980 |
15 |
Weight, kg, max |
300 |
Warranty period is 12 months from commissioning. Worldwide delivery.