On 10-15 May, GlobeCore representatives visited Kokshetau, Kazakhstan to commission a UVB-1 bitumen emulsion unit with the production capacity of 2 m3/hour).
This GlobeCore equipment can be used to make all types of bitumen emulsion for road repairs or construction. The UVB-1 operates in an automation-assisted mode and consists of several components assembled on a common frame and interconnected by piping.
GlobeCore bitumen emulsion production equipment is available in different production capacities from 1 to 20 m3/hour and in various designs (containerized, framed, mobile or stationary). For more information on choosing the best option, use one of our contacts on the corresponding page.